Traceability              Integrated Production...
 
Cabo Cope 1011  |   Pozo Esparto0102    Portajo0306  
 Another Countryfields4445     |    Cuevas0207            |  Cullar4444 
       

CULLAR PLANTATION TRACEABILITY

Pests in Cúllar Plantation

TRACEABILITY 2005 Cúllar plantation.

          SPECIFIC PLANTATION DATA  |                REGISTRY NO., MURCIA, 1857/30-PR-01

FARM NAME

   SANDÍA CULLAR

Municipal District:

   CULLAR  (Granada)

Crop:

   WATERMELON

Company:

   POZO SUR S.L

Mailing Address:

   C/ Doctor Luis Prieto, 58 Bj.  Phone: +34 968-493213

Responsible Agriculturist:

 Daniel López Serrano 

Control Certification Company:

  Citrocontrol S.L.  C/ San Cristóbal, 43 -Águilas -30880   [MURCIA]Tl- Tl 950 46 47 21

                                                                                                CROP DATA

 Date
Planting

Location


Cadastral ID

 Area
(Ha.)

Sector

Variety

 Plants
number

 Date
Harvesting

Cycle

Sub-plot

28/31-05-05

BAZA Pol: 6
Parc: 66
6,6 BAICO SS2-SC1 42.000 31-08-05 92 480
                    

                                                                                                TASKS

  Cultivator application in two directions at right angles to each other.
Placement of drip irrigation and dressing pads with black polyethylene. One meter width and 100 gauge thickness.
Works in rows.

                                                 BASAL DRESSING

  Sheep manure. Distribution: from 3 to 4 kg/m2

PERFORMANCE:

  

NOTES:

                                                                                                            TREATMENT SCHEDULE

Dates

Products

Active Material

Doses

Safety Period

Free Day

Sub-
Plot

   09 - 07 - 05     Aliette                        Foseti-Al           0,3                  15     24-07-05                        480
    02/08/05 Vertimec
Curzate M
Delfin
BB5
 Abamectina
Cimoxalino + Mancoceb

Bacillus thuringiensis
Coadyudante

0,10
0,30
0,10
0,25

                  3
                15
                  2
                  -

    17-08-05                        480

    16/08/05

Micene WP
Cascade
Dominex
BB5

 Mancoceb 80%
 Flufenoxuron
10 %
Alfa-cipermetrin
Coadyudante

0,25
0,10
0,04
0,40

                 3
                 3
                 2
                 -
    20-08-05                        480
             

                                                           FERTILIZER-ENRICHED IRRIGATION

Dates

Irrigation
Time

Kg. Fertilizers / Irrigation / Ha.

Sub-Plot

Ammonium Nitrate

Phosphoric Acid

Potassium Nitrate

Calcium Nitrate

Nitric Acid

Mono-ammonium Phosphate

 28-03/06/05

1 riego / 2h 

 4

 -

4

-

1

4

                                 480

 04-13/06/05

1 riego / 2h 

 4

 -

4

-

2

4

                                 480

 14-24/06/05

1 riego / 2h 

 7,5

 -

4

-

2

7,5

                                 480

 25-10/07/05

1 riego / 2h 

 7,5

 -

7,5

-

2

7,5

                                 480

 11-20/07/05

1 riego / 3h 

 7,5

 -

7,5

-

2

7,5

                                 480

 21-31/07/05

1 riego / 3h 

 7,5

 -

15

7,5

2

-

                                 480