Traceability              Integrated Production...
 
Cabo Cope 1011  |   Pozo Esparto0102    Portajo0306  
Another Countryfields4445     |    Cuevas0207            |  Cullar4444 
       
       

CABO COPE PLANTATION TRACEABILITY

Pests in Cabo Cope Plantation

TRACEABILITY 2005 See Cope plantation.

          SPECIFIC PLANTATION DATA   1857/30-PR-02

FARM NAME

   COPE WATERMELON

Municipal District:

   ÁGUILAS    (Murcia, Spain)

Crop:

   WATERMELON

Company:

   POZO SUR S.L

Mailing Address:

   C/ Doctor Luis Prieto, 58 Bj.  Phone: +34 968-493213

Responsible Agriculturist:

  Daniel López Serrano y Juan David García

Control Certification Company:

  Citrocontrol S.L.  C/ San Cristóbal, 43 -Águilas -30880   [MURCIA]Tl- Tl 950 46 47 21

CROP DATA

 Date
Planting

Location


Cadastral ID

 Area
(Ha.)

Sector

Variety

 Plants
number

 Date
Harvesting

Cycle

Sub-plot

 24/02/2005

COPE   POL:16 Par: 16
POL:18 Par: 6 
COPE  SS2-SC1 17531 02-06-05 98 424

 25-26/02/2005

MATIAS POL:34 Par:196-135-140  8,4  MATIAS  SS3-SC2 22199 03-06-05 98 423

 03/03/2005

JUAN ASENSIO POL:33 Par:35-45  1,3  MALLAS  SS1 2085 18-06-05 107 478

 25-30/04/2005

PEÑA RUBIA POL:45 
Par:136 a 144
14,5  CHIVO  SS3-SC2
SS2-SC1
37796 27-06-05 58 420

 15-23/03/2005

PEÑA RUBIA pol: 45
parc: 129
16 MOCHUELO  SS2-SC1
SS3-SC2
SS1-SA
125590 08-06-05 97 900/02

 20-23/04/2005

PEÑA RUBIA POL:33 
Par:13
9 LOS PINARES  SS3-SA 23735 27-06-05 65 425
                   

TASKS

  Cultivator application in two directions at right angles to each other.
Placement of drip irrigation and dressing pads with black polyethylene. One meter width and 100 gauge thickness.
Postransplant protection with microtunnel of 150 gauge transparent polyethylene.
Works in rows.

BASAL DRESSING

  Sheep manure. Distribution: from 2 to 2.5 kg/m2

PERFORMANCE:

  

NOTES:

TREATMENT SCHEDULE

Dates

Products

Active Material

Doses

Safety Period

Free Day

Sub-
Plot

11-04-05 MICENE WP
VERTIMEC
ZELDOX
BIOBIT
MANCOCEB
ABAMECTINA
HECITIAZOX
BACILLUS THURINGIENSIS
0,25
0,075
0,075
0,20
3
7
14
-
26-04-05 478
05-05-05
MICENE PLUS
TRIFMINE
CASCADE
DELFIN
BB5
MANCOZEB
TRIFLUMIZOL
FLUFENOXURON
BACILLUS THURINGIENSIS
COADYUDANTE
0,20
0,08
0,08
0,10
0,02
15
3
3
-
-
21-05-05 478
06-05-05
CURZATE M
SABITHANE
BIOBIT
ECOIL
LIMBIO
BB5
CIMOXANILO + MANCOZEB
DINOCAP + MICLOBUTANIL
BACILLUS THURINGIENSIS
EXTRACTO DE NEEM
OLEATO POTASICO
COADYUDANTE
0,20
0,08
0,20
0,15

0,30
0,02
15
7
-
-
-
-
21-05-05 425
19-05-05
ZELDOX
VERTIMEC
DOMARK
MICENE PLUS
BIOBIT
BB5
HEXITIAZOX
ABAMECTINA
TETRAXONAZOL
CIMOXALINO + MANCOCEB
BACILLUS THURINGIENSIS
COADYUDANTE
0,075
0,10
0,050
0,30

0,20
0,02
14
3
7
15
-
04-06-05 900/02
20-05-05 CASCADE
DELFIN
ECOIL
LIMBO
BB5
FLUFENOXURON
BACILLUS THURINGIENSIS
EXTRACTO DE NEEM
OLEATO POTASICO
COADYUDANTE
0,08
0,10
0,10
0,30
0,02
3
-
-
-
-
24-05-05 424
22-05-05 CONFIDOR IMIDACLOPRID 0,070 3 26-05-05 424
22-05-05 CONFIDOR IMIDACLOPRID 0,075 3 26-05-05 478
22-05-05 CONFIDOR IMIDACLOPRID 0,075 3 26-05-05 423
23-05-05
DOMARK
BACTUR
ECOIL
LIMBIO
TETRACONAZOL
BACILLUS THURINGIENSIS
EXTRACTO DE NEEM
OLEATO POTASICO
0,075
0,20
0,10
0,30
7
-
-
-
31-05-05 425
26-05-05

S 2
MANZATE DP80
KARATE KING
CASCADE 
DELFIN
BB5
MANCOZEB
LAMBDA CIHALOTRIN
FLUFENOXURON
BACILLUS THURINGIENSIS
COADYUDANTE
0,20
0,07
0,08
0,10
0,02
3
3
3
-
-
30-05-05 423
28-05-05 MICENE WP
LIMBIO
BB5
MANCOZEB
OLEATO POTASICO
COADYUDANTE
0,20
0,30
0,02
3
-
-
01-06-05 424
28-05-05 CONFIDOR IMIDACLOPRID 0,075 3 04-06-05 900/02
07-06-05

S 3
MANZATE DP80
DOMARK
KARATE KING
BIOBIT
BB5
MANCOZEB
TETRACONAZOL
LAMBDA CIHALOTRIN
BACILLUS THURINGIENSIS
COADYUDANTE
0,20
0,05
0,08
0,20
0,02
3
7
3
-
-
15-06-05 424
10-06-05
CURZATE M
SYSTHANE
LAITANE
KARATE KING
CIMOXANILO + MANCOZEB
MICLOBUTANIL
DINOCAP
LAMBDA CIHALOTRIN
0,20
0,04
0,04
0,08
15
3
3
3
27-06-05 420
14-06-05
DOMARK
CALYPSO
BIOBIT
TETRACONAZOL
TIACLOPRID
BACILLUS THURINGIENSIS
0,05
0,03
0,20
7
3
-
23-06-05 423
17-06-05
DOMARK
BACTUR
ECOIL
TETRACONAZOL
BACILLUS THURINGIENSIS
EXTRACTO DE NEEM
0,05
0,10
0,10
7
-
-
26-06-05 420
10-07-05 STEWARD
LEPINOX
BB5
INDOXACARB
BACILLUS THURINGIENSIS
COADYUDANTE
0,02
0,25
0,25
1
-
-
12-07-05 425
11-07-05 STEWARD
LEPINOX
BB5
INDOXACARB
BACILLUS THURINGIENSIS
COADYUDANTE
0,02
0,25
0,25
1
-
-
13-07-05 420
             

FERTILIZER-ENRICHED IRRIGATION

Dates

Irrigation
Time

Kg. Fertilizers / Irrigation / Ha.

Sub-Plot

Ammonium Nitrate

Phosphoric Acid

Potassium Nitrate

Calcium Nitrate

Nitric Acid

Mono-ammonium Phosphate

Monopotassic
Phosphate
 03-03-05  2 por dia 2 h. 1 3 6 - 1 4 -  478
 06 al 15-04-05  1 por dia 45´m. 0,25 0,5 1 - 0,15 1 -  478
 16 al 20-04-05  1 por dia 50´m. 0,5 0,5 3 0,5 0,3 1 -  478
 21 al 27-04-05  1 por dia 1 h. 1 1 4 0,7 0,5 1 -  478
 28 al 09-05-05  2 por dia 1 h. 0,5 1 2 0,33 0,20 0,5 -  478
 10 al 31-05-05  2 por dia 2 h. 1 1 3,5 1 0,20 0,5 -  478
 01 al 30-06-05  2 por dia 3 h. 2,5 - 5,5 2,5 1 1 -  478
 01-03-05  2 por dia 3 h. 1 2 4 - 0,5 3 -  423
 06 al 31-03-05  1 por dia 45´m. 0,25 0,5 1 - 0,15 1 -  423
 01 al 30-04-05  1 por dia 1 h. 2 1 7 - 1 2 -  423
 01 al 31-05-05  1 por dia 4 h. 3 1 12    2,5 2,5 - -  423
 01 al 23-06-05  1 por dia 5 h. 3 1 6 2 2 - -  423
 01-03-05  2 por dia 2,5 h. 1 2 4     -     0,5 2,5 -  424
 02 al 31-03-05  1 por dia 45´m. 0,25 0,5 1 - 0,15 1 -  424
 01 al 14-04-05  1 por dia 75´m. 0,25 0,5 1 - 0,15 1 -  424
 15 al 03-05-05  1 por dia 1h. 1 1,5 3 - 0,5 1 -  424
 04 al 31-05-05  1 por dia 4h. 3,5 2 9 2 1 2 -  424
 01 al 30-06-05  1 por dia 2,5 h. 3 - 8 3 1 1,5 -  424
 01 al 31-05-05  1 por dia 2,5h. 0,5 1 2       0,5 1 -  425
 01 al 30-06-05  1 por dia 3 h. 3 1 6 2 1 1 -  425
 01 al 18-07-05  1 por dia 2,5 h. 1,5   3 1,5 0,5       425
 01 al 31-05-05  1 por dia 2,5h. 1 2 3 - 1 1,5 -  420
 01 al 30-06-05  1 por dia 3 h. 1,5 2,5 6,5 - 1 2,5 -  420
 01 al 01-07-05  1 por dia 3 h. 1,5 2,5 6,5       1 2,5     420
 02 al 17-07-05  1 por dia 3 h. 2 1 2 2 0,5       420
 18 al 25-07-05  1 por dia 1,5 h. 1,2 0,5 1,2 1,2 0,3       420
 15 al 22-04-05  1 por dia 0,5 h. 1 0,5 2 - 0.5 0.5 - 900/02
 23 al 13-05-05  1 por dia 0,5 h. 2 1 4 - 1 1 - 900/02
 14 al 31-05-05  1 por dia 0,5 h. 2 1 4 - 1 1 - 900/02
 01 al 08-06-05  1 por dia 3 h. 1,5 0,5 3 - 0,5 1 - 900/02
 09 al 28-06-05  1 por dia 6 h. - - 4 2,5 1 - - 900/02
 29 al 13-07-05  1 por dia 2 h. - 0,5 2,5 1 1 - - 900/02